Site Assessment
Review appliances, usage patterns, roof or ground space, wiring constraints and backup expectations.
From site assessment and load auditing to system design, installation and software development, the process starts with what the client actually needs to run.
Review appliances, usage patterns, roof or ground space, wiring constraints and backup expectations.
Build an appliance inventory, calculate connected load, daily energy and starting demand.
Specify inverter capacity, battery storage, PV array, protection and practical expansion options.
Professional installation, configuration and commissioning with attention to protection and safe cable routing.
Performance checks, troubleshooting and design reviews when demand or equipment changes.
Responsive websites, dashboards, calculators, CMS features, integrations and SEO-ready applications.
The exact scope depends on the site and brief. This table makes the deliverables clear before work begins.
| Stage | Primary work | Typical output | Client decision |
|---|---|---|---|
| 01 Assessment | Site information, appliances, operating hours, constraints | Load inventory + site notes | Confirm requirements |
| 02 Audit | Connected load, daily energy and peak/start demand | Load audit summary | Confirm target loads |
| 03 Design | Inverter, battery, PV and protection sizing | System design recommendation | Approve system scope |
| 04 Installation | Mounting, wiring, configuration and commissioning | Installed and tested system | Handover |
Final equipment selection is based on the actual site assessment and equipment specifications.